GPUTraceCriticalPath

Overview​

GPUTraceCriticalPath performs exact duration-weighted analysis over a trace's canonical parent forest. It keeps source identity intact and publishes ordinary graph views that renderers, filters, aggregations, and readback rings can consume without translating results through CPU objects.

At a glance

QuestionAnswer
ProblemFind exact duration-weighted critical paths in the canonical trace parent forest.
Reads / writesReads parents and durations; writes cumulative duration, critical predecessors, path mask, and diagnostics.
OwnershipPublic inputs and outputs are caller-owned; scratch storage is graph-owned transient memory.
Output contractExact selected path under the documented forest model, with cycle and invalid-parent reporting.
Expected workLogarithmic pointer-jumping rounds plus bounded endpoint selection and path publication.
ChunksCanonical span IDs remain stable across partitions.
Conditions / budgetsMay be spread across frame-budgeted steps for full-trace analysis.
Neighborhoodtrace parent forest → GPUTraceCriticalPath → focus mask, labels, and aggregation.

When to use​

Use this contributor when a trace has one canonical parent per span and the application needs the longest parent chain, per-span slack, or a critical-path mask. Use a dependency-DAG analysis instead when spans may have several causal predecessors.

Usage​

import {GPUTraceCriticalPath} from '@luma.gl/experimental/gpu-trace';

new GPUTraceCriticalPath({
parentIndices,
durations,
maximumRowsPerPass: 262_144,
output: {
pathDurations,
slackDurations,
criticalPredecessors,
rootIndices,
hopCounts,
criticalMask,
summary
}
}).addToGraph(graph);

Inputs and outputs​

ViewMeaning
pathDurationsInclusive duration from each span through its canonical parents
slackDurationsWinning duration minus the row's valid parent-path duration
criticalPredecessorsValidated parent identity or 0xffffffff
rootIndicesResolved root identity or 0xffffffff for cyclic rows
hopCountsParent-edge distance to the root
criticalMaskOne for spans on the selected longest path
summary[0]Maximum duration encoded as positive f32 bits
summary[1]Lowest stable endpoint attaining that duration
summary[2]Maximum resolved hop count
summary[3]Validation and incomplete-result flags

Execution and ownership​

The contributor initializes one compact state record per span and then uses pointer jumping to resolve every parent chain in ceil(log2(spanCount)) + 1 passes. Each pass doubles the resolved ancestor distance. Valid rows publish their root, hop count, and inclusive cumulative duration. The maximum duration is selected on the GPU, ties choose the lowest canonical endpoint index, and one bounded walk marks the exact winning path.

No submission or readback occurs inside the contributor. Scratch state is graph-owned and may be transiently allocated; all public outputs remain caller-owned.

Every pass publishes a static invocation bound. A caller can therefore use compiled.createExecution({maximumInvocationCount}) to submit dependency-ordered pieces over multiple frames. maximumRowsPerPass optionally divides initialization, pointer-jump, finalization, endpoint, and slack work into smaller graph nodes when an application needs a hard per-submission row bound. Leaving it unset minimizes pipeline count; setting it trades additional compiled nodes for finer queue scheduling.

Capacity, validation, and failure behavior​

The summary flags distinguish invalid parents, invalid durations, cycles, numeric overflow, and a critical path that exceeded maximumCriticalPathLength. Invalid or cyclic parent chains cannot win endpoint selection. Applications can expose these flags directly in graph diagnostics instead of presenting a silent partial result.

Limitations​

This contract is exact for one canonical parent per span. It deliberately does not pretend that a parent forest is a general dependency DAG: multi-parent topological preparation, full CPM earliest and latest times, and dependency-level wait attribution are the next causal-analysis layer. The stable outputs here are designed to feed that extension without changing canonical span identity.